We turned the temperature in the production area back down to 23 C, as the weather has warmed up a bit.
The production area was too cold, so we increased the target temperature to 23 C. We hope to be able to turn it back down when the system is working properly.
The temperature sensor in the despatch area was moved, as it was directly below a roof tile cut-out that circulated hot air.
Temperature sensors were also moved in production, finished goods and components stores.
The downstairs temperature was adjusted, and the two high-load units were turned off.
Airflow ducts were adjusted upstairs and downstairs.