The development area was too warm, so we dropped the target temperature from 22 C to 19 C.
We changed the setup of the development area air conditioning.
In the afternoon, we installed an air blower in the plant room to keep the servers cool.
Follow Pico Technology's journey from energy hog to energy saver.
All WordsSome WordEntire phrase
air conditioning air filters april fool board room cooling crt despatch development dynamic web pages elevator energy meters energy usage enviromon fans finished goods heating hvac james house kill-a-watt kitchen lift lighting lights meter meter readings monitors network switches plant room polar foil preheater production sensor spare room stores temperature tft timers vents water heaters weather